Skip to main content

Babergh · planning decisions

Babergh: cooling planning decisions

Written by Solomon Amos.

Sources: CIBSE TM59, Building Regs Part O, gov.uk Boiler Upgrade Scheme, and MCS (the certification scheme for registered installers) - see methodology

Last checked against current grant rules on 14 August 2026

Quick answer

Usually. Babergh approved 36 of the 39 cooling-plant applications it has decided, a rate of 92.3% spanning every development type and including 7 householder cases. A cooling-only unit still needs a full planning application, because the permitted-development route on a house belongs only to an air-to-air heat pump, which heats as well as cools.

What Babergh has decided

Babergh has issued 39 cooling determinations, on applications that say so in their own wording - 36 approvals against 3 refusals. Enough to describe, not enough to be definitive.

Babergh's record holds 13 more that never reached a determination, whether because they remain live or because the applicant pulled them. Everything below excludes them, so the rate describes determined cases only.

92.3% of the 39 decisions were approvals, a figure covering all development types and 7 householder applications. The refusals behind the remaining share are real rather than rounding.

The scope matters as much as the number. Commercial and mixed-use plant makes up a large share of any council's cooling caseload, so an all-development rate is a weaker guide to a domestic application than its size suggests.

We stop short of a householder-only percentage for Babergh. At 7 decided householder applications the sample is too thin, and a rate drawn from it would read as far more certain than the evidence allows.

The air-to-air heat pump, which heats as well as cools and is the only equipment that can be permitted development on a house, appears in none of Babergh's decided applications by name. Nationally the count is similarly close to zero: this is a category planning departments have barely met.

Air-source heat pumps, counted separately

There is little to choose between the two here: 92.7% of the 55 decided applications mentioning an air-source heat pump were approved by Babergh, a whisker from its cooling-plant record.

These two figures are never added, averaged or read as one. Most air-source schemes heat rather than cool, and an application mentioning both sits in both counts.

The distinction is the whole point: an air-to-air heat pump, which heats as well as cools, can be permitted development on a house, and a cooling-only unit cannot.

The rule these decisions are made under

Since 2025-05-29, England's permitted-development rules let a house fit an air-to-air heat pump, which heats as well as cools, without a planning application in many cases, within set size, siting and noise limits. A unit that only cools has no equivalent route and needs a full application whatever the property.

That is why the decisions above matter more than they would have before the change. Every cooling-only installation now crosses a planning officer's desk, so the council's posture is not background information, it is the decision.

Flats are the sharpest exception, here as everywhere in England: the permitted-development right for an outdoor unit belongs to the house rather than to a flat within it, so a flat will usually need freeholder or managing-agent consent as well as planning permission.

What gets refused, and what gets attached

What those refusals were FOR is a national question at the volume of officer reasoning currently published, not a council-level one, and we do not pretend otherwise. Both findings are set out with their sample sizes: why cooling applications get refused and the conditions councils attach to an approval.

Every council we can publish a figure for is listed on the council index.

What this data does not show

Applications are identified from their own description, so every count on these pages means applications mentioning cooling equipment, not every cooling installation in the area. An application that fitted the same kit but described it as external plant is not in these figures, which makes them a floor on activity rather than a census.

Each application is assigned to Babergh through the postcode on the application itself. Of the 52 applications recorded for this authority, 100% carry a location we could resolve; nationally 1738 of 19260 applications could not be tied to a district at all and sit outside every figure on this site rather than being quietly assigned somewhere.

What this page cannot tell you is what will happen at your address. It has no view of your elevation, your neighbours' windows, whether your home sits in a conservation area, or whether it is a listed building - and a neighbour's approval settles none of those. This is indicative guidance drawn from public planning records, not legal advice: confirm the final position with your Local Planning Authority before you install.

Planning figures are computed from decided planning applications published by UK local planning authorities on their statutory planning registers, aggregated via PlanIt. Contains public sector information licensed under the Open Government Licence v3.0. Figures are indicative and are not a statement by any council. Data as of September 2026. See all data sources.

Recent decisions you can check yourself

These are real applications Babergh has decided, taken from its own statutory planning register. Every one links back to the council's entry, so nothing here has to be taken on trust.

12 most recent of 94 decided

  • DC/26/03553Approved

    Application for a Non-Material Amendment to DC/25/00161 - Addition of small window to north elevation; Air Source Heat...

    BaberghDecided 8 September 2026Authority record
  • DC/26/01611Approved

    Discharge of Conditions Application for DC/25/00745 - Conditions 2 (Materials), 9 (Air Source heat Pumps) and 11...

    BaberghDecided 20 May 2026Authority record
  • DC/26/00101Approved

    Application for Listed Building Consent - Installation of air conditioning units on the property of the Barn at Copdock...

    BaberghDecided 10 March 2026Authority record
  • BaberghMidSuffolk/DC/25/02670Approved

    Discharge of Conditions Application for DC/23/00910 - Conditions: 3 (EPS Licence for Bats); 4 (Biodiversity Enhancement...

    BaberghDecided 2 September 2025Authority record
  • BaberghMidSuffolk/DC/25/02583Approved

    Application for listed building consent - Erect a free standing hot and cold air conditioning unit on the flat roof...

    BaberghDecided 7 August 2025Authority record
  • BaberghMidSuffolk/DC/25/02644Approved

    Planning Application - Erect a free standing hot and cold air conditioning unit on the flat roof...

    BaberghDecided 7 August 2025Authority record
  • BaberghMidSuffolk/DC/25/01763Approved

    Householder Application - Installation of air source heat pump...

    BaberghDecided 6 August 2025Householder applicationAuthority record
  • BaberghMidSuffolk/DC/25/02706Approved

    Discharge of Conditions Application for DC/24/03083 - Condition 6 (Air Source Heat Pumps)...

    BaberghDecided 20 June 2025Authority record
  • BaberghMidSuffolk/DC/25/01841Approved

    Discharge of Conditions Application for DC/24/05028 - Condition 17 (Biodiversity Enhancement Strategy), Condition 18...

    BaberghDecided 5 June 2025Authority record
  • BaberghMidSuffolk/DC/25/01474Approved

    Application for a Non Material Amendment relating to DC/24/04696 - Relocation of PV array and ASHP. Addition of gravel...

    BaberghDecided 1 April 2025Authority record
  • BaberghMidSuffolk/DC/25/00695Approved

    Discharge of Conditions Application for DC/24/03515 - 4 (Render), 6 (Air Source heat Pump Screening), 7 (Mechanical...

    BaberghDecided 21 March 2025Authority record
  • BaberghMidSuffolk/DC/25/00149Approved

    Householder Application - Erection of extensions, and alterations to the external appearance including new windows and...

    BaberghDecided 18 March 2025Householder applicationAuthority record

82 further decided applications are held for Babergh and counted in the figures above. They are not listed here to keep the page readable, not because they say anything different.

Statutory planning-register entries published by Babergh. Applicant, agent and case-officer names and full addresses are not shown. Descriptions are the applicant's own wording, shortened. Each entry links to the council's own register, which is the authoritative record.

Planning-application data

The applications listed here are entries on the statutory planning register of the named local planning authority, kept under section 69 of the Town and Country Planning Act 1990 and article 40 of the Town and Country Planning (Development Management Procedure) (England) Order 2015. Aggregate figures on this page contain public sector information licensed under the Open Government Licence v3.0.

We show only the application reference, a shortened description, the decision and its date. We do not show applicant, agent or case-officer names, or full addresses. We publish decided applications only. The council's own register is the authoritative record and every entry links to it; where this page and the council disagree, the council is right.

GetComfort is not a planning authority and this is not planning advice. If an entry here concerns your property and you would like it removed, email [email protected] and we will remove it. See all data sources.

Check your own Babergh home

Enter your address for a property-specific planning verdict, the right cooling system, and an indicative cost.

  1. Address
  2. Confirm
  3. Questions
  4. Plan

Let's look at your home

We use property data to pre-fill the boring bits - no long forms, and we never cold-call you.

Frequently asked questions

Does Babergh approve air conditioning applications?

92.3% of the 39 applications mentioning cooling plant that Babergh has decided were approved. That covers all development types and includes 7 householder applications, so read it as the council's general posture rather than as your own odds.

Do I need planning permission for air conditioning?

For a cooling-only unit, yes, always. Since May 2025 the permitted-development route on a house is open only to an air-to-air heat pump, which heats as well as cools; a unit that only cools is excluded from it entirely and needs a full application. Flats are a further exception, because the permitted-development right sits with the house rather than the flat within it.

How many air conditioning applications has Babergh refused?

3 of the 39 decided applications mentioning cooling plant were refused. That is too few for us to draw any pattern from, and we do not publish refusal-grounds analysis on a sample that small.

Is this the approval rate for homes, or for all buildings?

All buildings. Commercial and mixed-use schemes are a large share of any cooling caseload, and Babergh has decided 7 householder applications, which is below the sample size we publish a separate domestic rate from. The count is disclosed so you can see the denominator you are actually working with.

Every home is different - your floor, aspect, EPC band, heating type and conservation status all change the answer. Our free cooling checker pre-fills your home from public property data (EPC and UPRN records) and turns this council-level picture into a property-specific planning verdict for your own Babergh address, alongside the right cooling system for your home and an indicative cost. No phone call, no waiting.

Check my home

You will see your full cooling plan instantly. If you would like us to email it to you, or to have a single accredited local installer contact you about a free survey, you choose that at the end - we only get in touch if you ask.

This is indicative planning guidance drawn from public records, not legal advice - always confirm the final position with your Local Planning Authority (LPA) before you install. Every figure above follows our published methodology.

More on planning and cooling in Babergh