Bexley · planning decisions
Bexley: cooling planning decisions
Written by Solomon Amos.
Sources: CIBSE TM59, Building Regs Part O, gov.uk Boiler Upgrade Scheme, and MCS (the certification scheme for registered installers) - see methodology
Last checked against current grant rules on 14 August 2026
Quick answer
Usually, with a real minority refused: 89.2% of 65 decisions were approvals, all development types included, 20 of them domestic. A cooling-only unit still needs a full planning application, because the permitted-development route on a house belongs only to an air-to-air heat pump, which heats as well as cools.
What Bexley has decided
Bexley has decided 65 planning applications mentioning air conditioning or other cooling plant: 58 approved, 7 refused.
A further 11 applications mentioning cooling plant sit on Bexley's record with no decision against them - still live, withdrawn, or closed some other way. None of them are in the rate below, and that cuts both ways: a withdrawal is an applicant changing their mind, not a council saying no.
That works out at 89.2% across 65 decisions covering all development types, 20 of them householder applications. Roughly one application in eight does not get through, which is enough to make siting and presentation worth genuine attention.
The scope matters as much as the number. Commercial and mixed-use plant makes up a large share of any council's cooling caseload, so an all-development rate is a weaker guide to a domestic application than its size suggests.
The householder subset is large enough here to stand on its own, which is unusual: Bexley approved 17 of 20 householder applications, a rate of 85%. That is the closest figure on this page to a homeowner's actual position.
Not one of Bexley's decided applications names an air-to-air system in its own description - the equipment that both heats and cools, and the only category with a permitted-development route on a house. That is the national picture in miniature, and worth knowing before you assume your case officer will recognise the category on sight.
The rule these decisions are made under
Since 2025-05-29, England's permitted-development rules let a house fit an air-to-air heat pump, which heats as well as cools, without a planning application in many cases, within set size, siting and noise limits. A unit that only cools has no equivalent route and needs a full application whatever the property.
That is why the decisions above matter more than they would have before the change. Every cooling-only installation now crosses a planning officer's desk, so the council's posture is not background information, it is the decision.
Flats are the sharpest exception, here as everywhere in England: the permitted-development right for an outdoor unit belongs to the house rather than to a flat within it, so a flat will usually need freeholder or managing-agent consent as well as planning permission.
What gets refused, and what gets attached
What those refusals were FOR is a national question at the volume of officer reasoning currently published, not a council-level one, and we do not pretend otherwise. Both findings are set out with their sample sizes: why cooling applications get refused and the conditions councils attach to an approval.
Every council we can publish a figure for is listed on the council index.
What this data does not show
Applications are identified from their own description, so every count on these pages means applications mentioning cooling equipment, not every cooling installation in the area. An application that fitted the same kit but described it as external plant is not in these figures, which makes them a floor on activity rather than a census.
Each application is assigned to Bexley through the postcode on the application itself. Of the 76 applications recorded for this authority, 100% carry a location we could resolve; nationally 1682 of 18427 applications could not be tied to a district at all and sit outside every figure on this site rather than being quietly assigned somewhere.
What this page cannot tell you is what will happen at your address. It has no view of your elevation, your neighbours' windows, whether your home sits in a conservation area, or whether it is a listed building - and a neighbour's approval settles none of those. This is indicative guidance drawn from public planning records, not legal advice: confirm the final position with your Local Planning Authority before you install.
Planning figures are computed from decided planning applications published by UK local planning authorities on their statutory planning registers, aggregated via PlanIt. Contains public sector information licensed under the Open Government Licence v3.0. Figures are indicative and are not a statement by any council. Data as of August 2026. See all data sources.
Check your own Bexley home
Enter your address for a property-specific planning verdict, the right cooling system, and an indicative cost.
- Address
- Confirm
- Questions
- Plan
Let's look at your home
We use property data to pre-fill the boring bits - no long forms, and we never cold-call you.
Frequently asked questions
Does Bexley approve air conditioning applications?
Usually. 89.2% of the 65 applications mentioning cooling plant decided by Bexley were approved, across all development types and including 20 householder applications - so a meaningful minority did not get through.
Do I need planning permission for air conditioning?
For a cooling-only unit, yes, always. Since May 2025 the permitted-development route on a house is open only to an air-to-air heat pump, which heats as well as cools; a unit that only cools is excluded from it entirely and needs a full application. Flats are a further exception, because the permitted-development right sits with the house rather than the flat within it.
How many air conditioning applications has Bexley refused?
7 of the 65 decided applications mentioning cooling plant were refused. That is too few for us to draw any pattern from, and we do not publish refusal-grounds analysis on a sample that small.
Is this the approval rate for homes, or for all buildings?
Both are on this page and they are kept apart. The headline covers all development types across 65 decisions; the householder-only rate is 85% across 20 decisions, and that is the one closest to a domestic case.
Every home is different - your floor, aspect, EPC band, heating type and conservation status all change the answer. Our free cooling checker pre-fills your home from public property data (EPC and UPRN records) and turns this council-level picture into a property-specific planning verdict for your own Bexley address, alongside the right cooling system for your home and an indicative cost. No phone call, no waiting.
Check my homeYou will see your full cooling plan instantly. If you would like us to email it to you, or to have a single vetted local installer contact you about a free survey, you choose that at the end - we only get in touch if you ask.
This is indicative planning guidance drawn from public records, not legal advice - always confirm the final position with your Local Planning Authority (LPA) before you install. Every figure above follows our published methodology.
