Skip to main content

Bolton · planning decisions

Bolton: cooling planning decisions

Written by Solomon Amos.

Sources: CIBSE TM59, Building Regs Part O, gov.uk Boiler Upgrade Scheme, and MCS (the certification scheme for registered installers) - see methodology

Last checked against current grant rules on 14 August 2026

Quick answer

Almost always. Bolton approved 47 of the 48 cooling-plant applications it has decided, a rate of 97.9% spanning every development type and including 15 householder cases. A cooling-only unit still needs a full planning application, because the permitted-development route on a house belongs only to an air-to-air heat pump, which heats as well as cools.

What Bolton has decided

Bolton has decided 48 planning applications mentioning air conditioning or other cooling plant. 47 were approved and 1 were refused - a working sample rather than a deep one, but enough to read a posture from.

Set beside the decided cases are 7 without an outcome at all in Bolton - pending, or withdrawn before an officer ruled. Keeping those out of the denominator is deliberate: an abandoned application tells you nothing about what the council would have said.

That is an approval rate of 97.9% across 48 decisions covering every development type, 15 of them householder applications - close to universal. A rate this high usually says as much about what gets submitted as about what gets waved through: schemes likely to fail tend to be withdrawn rather than decided, and a withdrawal is not in this denominator.

The scope matters as much as the number. Commercial and mixed-use plant makes up a large share of any council's cooling caseload, so an all-development rate is a weaker guide to a domestic application than its size suggests.

The homeowner-specific rate is the one most people want, and Bolton has not yet decided enough domestic applications for it: 15 is under our publication floor, so you get the count and no percentage.

No decided application in Bolton names an air-to-air heat pump, the one category that both heats and cools. Do not read that as the council disliking them - read it as a case officer who has probably not seen one, which is a different problem and a solvable one.

Air-source heat pumps, counted separately

Air-source heat pumps do slightly worse here. Of the 29 applications mentioning one that Bolton has decided, 89.7% were approved, below its cooling-plant record above.

These two figures are never added, averaged or read as one. Most air-source schemes heat rather than cool, and an application mentioning both sits in both counts.

The distinction is the whole point: an air-to-air heat pump, which heats as well as cools, can be permitted development on a house, and a cooling-only unit cannot.

The rule these decisions are made under

Since 2025-05-29, England's permitted-development rules let a house fit an air-to-air heat pump, which heats as well as cools, without a planning application in many cases, within set size, siting and noise limits. A unit that only cools has no equivalent route and needs a full application whatever the property.

That is why the decisions above matter more than they would have before the change. Every cooling-only installation now crosses a planning officer's desk, so the council's posture is not background information, it is the decision.

Flats are the sharpest exception, here as everywhere in England: the permitted-development right for an outdoor unit belongs to the house rather than to a flat within it, so a flat will usually need freeholder or managing-agent consent as well as planning permission.

What gets refused, and what gets attached

What those refusals were FOR is a national question at the volume of officer reasoning currently published, not a council-level one, and we do not pretend otherwise. Both findings are set out with their sample sizes: why cooling applications get refused and the conditions councils attach to an approval.

Every council we can publish a figure for is listed on the council index.

What this data does not show

Applications are identified from their own description, so every count on these pages means applications mentioning cooling equipment, not every cooling installation in the area. An application that fitted the same kit but described it as external plant is not in these figures, which makes them a floor on activity rather than a census.

Each application is assigned to Bolton through the postcode on the application itself. Of the 55 applications recorded for this authority, 100% carry a location we could resolve; nationally 1682 of 18427 applications could not be tied to a district at all and sit outside every figure on this site rather than being quietly assigned somewhere.

What this page cannot tell you is what will happen at your address. It has no view of your elevation, your neighbours' windows, whether your home sits in a conservation area, or whether it is a listed building - and a neighbour's approval settles none of those. This is indicative guidance drawn from public planning records, not legal advice: confirm the final position with your Local Planning Authority before you install.

Planning figures are computed from decided planning applications published by UK local planning authorities on their statutory planning registers, aggregated via PlanIt. Contains public sector information licensed under the Open Government Licence v3.0. Figures are indicative and are not a statement by any council. Data as of August 2026. See all data sources.

Check your own Bolton home

Enter your address for a property-specific planning verdict, the right cooling system, and an indicative cost.

  1. Address
  2. Confirm
  3. Questions
  4. Plan

Let's look at your home

We use property data to pre-fill the boring bits - no long forms, and we never cold-call you.

Frequently asked questions

Does Bolton approve air conditioning applications?

Yes, in almost every decided case: 97.9% of 48 decisions, spanning every development type with 15 householder applications among them. Read it as posture rather than certainty - an application withdrawn before determination never enters the figure.

Do I need planning permission for air conditioning?

For a cooling-only unit, yes, always. Since May 2025 the permitted-development route on a house is open only to an air-to-air heat pump, which heats as well as cools; a unit that only cools is excluded from it entirely and needs a full application. Flats are a further exception, because the permitted-development right sits with the house rather than the flat within it.

How many air conditioning applications has Bolton refused?

Only 1, from 48 decided applications mentioning cooling plant. Too small a number to generalise from, so there is no refusal-grounds section on this page.

Is this the approval rate for homes, or for all buildings?

All buildings. Commercial and mixed-use schemes are a large share of any cooling caseload, and Bolton has decided 15 householder applications, which is below the sample size we publish a separate domestic rate from. The count is disclosed so you can see the denominator you are actually working with.

Every home is different - your floor, aspect, EPC band, heating type and conservation status all change the answer. Our free cooling checker pre-fills your home from public property data (EPC and UPRN records) and takes it from the council's record down to your own address in Bolton, with a property-specific planning verdict, the right cooling system for your home, and an indicative cost. No phone call, no waiting.

Check my home

You will see your full cooling plan instantly. If you would like us to email it to you, or to have a single vetted local installer contact you about a free survey, you choose that at the end - we only get in touch if you ask.

This is indicative planning guidance drawn from public records, not legal advice - always confirm the final position with your Local Planning Authority (LPA) before you install. Every figure above follows our published methodology.

More on planning and cooling in Bolton