Camden: cooling planning decisions

Written by Solomon Amos.

Sources: CIBSE TM59, Building Regs Part O, gov.uk Boiler Upgrade Scheme, and MCS (the certification scheme for registered installers) - see methodology

Last checked against current grant rules on 14 August 2026

Quick answer

Yes, on the record so far. Out of 28 determined applications naming air conditioning or a condenser, Camden said yes to 28 of them, 100%, with 8 of the 28 being domestic. A cooling-only unit still needs a full planning application, because the permitted-development route on a house belongs only to an air-to-air heat pump, which heats as well as cools.

What Camden has decided

Camden sits close to our publication floor. It has issued 28 cooling determinations, counting applications that say so in their own wording, splitting 28 to 0 in the applicant's favour, so read what follows as a first indication rather than a settled pattern.

Camden's record holds 55 more that never reached a determination, whether because they remain live or because the applicant pulled them. Everything below excludes them, so the rate describes determined cases only.

100% of the 28 decisions were approvals, and the scope belongs with the figure - it covers all development types and includes 8 householder applications. About as close to a formality as a council record gets, though withdrawn applications are not decisions and are not counted here.

The scope matters as much as the number. Commercial and mixed-use plant makes up a large share of any council's cooling caseload, so an all-development rate is a weaker guide to a domestic application than its size suggests.

We stop short of a householder-only percentage for Camden. At 8 decided householder applications the sample is too thin, and a rate drawn from it would read as far more certain than the evidence allows.

One caveat that applies throughout: the deep historical backfill has not yet covered Camden, which makes 28 a floor, not a total. The rate is drawn from what we hold, a recent slice rather than the full history. Our records for Camden begin in February 2026, so nothing here describes a change over time.

Only 2 of Camden's decided applications name an air-to-air system in their own description, the one category that both heats and cools. Nationally the figure is similarly thin: planning departments are barely seeing this equipment yet.

Air-source heat pumps, counted separately

Heat-pump applications meet slightly more resistance in Camden than cooling plant does: 96.9% of 32 decisions on applications mentioning an air-source heat pump were approvals.

These two figures are never added, averaged or read as one. Most air-source schemes heat rather than cool, and an application mentioning both sits in both counts.

The distinction is the whole point: an air-to-air heat pump, which heats as well as cools, can be permitted development on a house, and a cooling-only unit cannot.

The rule these decisions are made under

Since 2025-05-29, England's permitted-development rules let a house fit an air-to-air heat pump, which heats as well as cools, without a planning application in many cases, within set size, siting and noise limits. A unit that only cools has no equivalent route and needs a full application whatever the property.

That is why the decisions above matter more than they would have before the change. Every cooling-only installation now crosses a planning officer's desk, so the council's posture is not background information, it is the decision.

Flats are the sharpest exception, here as everywhere in England: the permitted-development right for an outdoor unit belongs to the house rather than to a flat within it, so a flat will usually need freeholder or managing-agent consent as well as planning permission.

What gets refused, and what gets attached

What those refusals were FOR is a national question at the volume of officer reasoning currently published, not a council-level one, and we do not pretend otherwise. Both findings are set out with their sample sizes: why cooling applications get refused and the conditions councils attach to an approval.

Every council we can publish a figure for is listed on the council index.

What this data does not show

Applications are identified from their own description, so every count on these pages means applications mentioning cooling equipment, not every cooling installation in the area. An application that fitted the same kit but described it as external plant is not in these figures, which makes them a floor on activity rather than a census.

Each application is assigned to Camden through the postcode on the application itself. Of the 83 applications recorded for this authority, 100% carry a location we could resolve; nationally 1738 of 19260 applications could not be tied to a district at all and sit outside every figure on this site rather than being quietly assigned somewhere.

What this page cannot tell you is what will happen at your address. It has no view of your elevation, your neighbours' windows, whether your home sits in a conservation area, or whether it is a listed building - and a neighbour's approval settles none of those. This is indicative guidance drawn from public planning records, not legal advice: confirm the final position with your Local Planning Authority before you install.

Planning figures are computed from decided planning applications published by UK local planning authorities on their statutory planning registers, aggregated via PlanIt. Contains public sector information licensed under the Open Government Licence v3.0. Figures are indicative and are not a statement by any council. Data as of September 2026. See all data sources.

Recent decisions you can check yourself

These are real applications Camden has decided, taken from its own statutory planning register. Every one links back to the council's entry, so nothing here has to be taken on trust.

12 most recent of 59 decided

  • 2026/3064/PApproved

    Installation of a free standing air source heat pump in the rear courtyard. Installation of an innovative, thin and...

    CamdenDecided 18 September 2026Householder applicationAuthority record
  • 2026/3087/LApproved

    Installation of a free standing air source heat pump in the rear courtyard. Installation of an innovative, thin and...

    CamdenDecided 18 September 2026Authority record
  • 2026/3489/PApproved

    Details of windows and facing materials required by condition 3 (details and samples of external materials and roofing)...

    CamdenDecided 16 September 2026Authority record
  • 2026/0599/PApproved

    Instalation of an external wall mounted condenser unit and associated equipment in front basement lightwell.

    CamdenDecided 15 September 2026Authority record
  • 2026/3349/PApproved

    Details pursuant to condition 5 (Cycle storage) and condition 6 (ASHPs - Noise levels) of prior approval ref.

    CamdenDecided 14 September 2026Authority record
  • 2026/2711/PApproved

    Erection of a first floor side extension and relocation of an existing A/C unit above the roof of the proposed...

    CamdenDecided 10 September 2026Householder applicationAuthority record
  • 2026/2929/PApproved

    Certificate of lawfulness (proposed) for the erection of PV panels on the roof and an ASHP in the lower ground floor...

    CamdenDecided 3 September 2026Authority record
  • 2026/2470/PApproved

    Installation of two condenser units and associated supply and extract grilles within an existing rooftop service area...

    CamdenDecided 3 September 2026Householder applicationAuthority record
  • 2026/2764/PApproved

    Installation of roof top plant (including 6 x extract fans, 6 x external condensers, and 1 x air handling unit), and...

    CamdenDecided 3 September 2026Householder applicationAuthority record
  • 2026/2546/LApproved

    Installation of two condenser units and associated supply and extract grilles within an existing rooftop service area...

    CamdenDecided 25 August 2026Authority record
  • 2026/2095/PApproved

    Installation of 3 external condenser units to the rear flat roof (replace redundant units).

    CamdenDecided 13 August 2026Householder applicationAuthority record
  • 2026/2243/LApproved

    Internal refurbishment to first floor office, window repairs and installation of internal secondary glazing...

    CamdenDecided 13 August 2026Authority record

47 further decided applications are held for Camden and counted in the figures above. They are not listed here to keep the page readable, not because they say anything different.

Statutory planning-register entries published by Camden. Applicant, agent and case-officer names and full addresses are not shown. Descriptions are the applicant's own wording, shortened. Each entry links to the council's own register, which is the authoritative record.

Planning-application data

The applications listed here are entries on the statutory planning register of the named local planning authority, kept under section 69 of the Town and Country Planning Act 1990 and article 40 of the Town and Country Planning (Development Management Procedure) (England) Order 2015. Aggregate figures on this page contain public sector information licensed under the Open Government Licence v3.0.

We show only the application reference, a shortened description, the decision and its date. We do not show applicant, agent or case-officer names, or full addresses. We publish decided applications only. The council's own register is the authoritative record and every entry links to it; where this page and the council disagree, the council is right.

GetComfort is not a planning authority and this is not planning advice. If an entry here concerns your property and you would like it removed, email [email protected] and we will remove it. See all data sources.

Check your own Camden home

Enter your address for a property-specific planning verdict, the right cooling system, and an indicative cost.

  1. Address
  2. Confirm
  3. Questions
  4. Plan

Let's look at your home

We use property data to pre-fill the boring bits - no long forms, and we never cold-call you.

Frequently asked questions

Does Camden approve air conditioning applications?

Yes, in almost every decided case: 100% of 28 decisions, spanning every development type with 8 householder applications among them. Read it as posture rather than certainty - an application withdrawn before determination never enters the figure.

Do I need planning permission for air conditioning?

For a cooling-only unit, yes, always. Since May 2025 the permitted-development route on a house is open only to an air-to-air heat pump, which heats as well as cools; a unit that only cools is excluded from it entirely and needs a full application. Flats are a further exception, because the permitted-development right sits with the house rather than the flat within it.

How many air conditioning applications has Camden refused?

None. All 28 of the decided applications mentioning cooling plant that Camden has determined were approved. That is a real result rather than a data gap, though it says nothing about applications withdrawn before a decision.

Is this the approval rate for homes, or for all buildings?

All buildings. Commercial and mixed-use schemes are a large share of any cooling caseload, and Camden has decided 8 householder applications, which is below the sample size we publish a separate domestic rate from. The count is disclosed so you can see the denominator you are actually working with.

Every home is different - your floor, aspect, EPC band, heating type and conservation status all change the answer. Our free cooling checker pre-fills your home from public property data (EPC and UPRN records) and takes it from the council's record down to your own address in Camden, with a property-specific planning verdict, the right cooling system for your home, and an indicative cost. No phone call, no waiting.

Check my home

You will see your full cooling plan instantly. If you would like us to email it to you, or to have a single accredited local installer contact you about a free survey, you choose that at the end - we only get in touch if you ask.

This is indicative planning guidance drawn from public records, not legal advice - always confirm the final position with your Local Planning Authority (LPA) before you install. Every figure above follows our published methodology.