Skip to main content

Ealing · planning decisions

Ealing: cooling planning decisions

Written by Solomon Amos.

Sources: CIBSE TM59, Building Regs Part O, gov.uk Boiler Upgrade Scheme, and MCS (the certification scheme for registered installers) - see methodology

Last checked against current grant rules on 14 August 2026

Quick answer

Usually. Ealing approved 98 of the 108 cooling-plant applications it has decided, a rate of 90.7% spanning every development type and including 49 householder cases. A cooling-only unit still needs a full planning application, because the permitted-development route on a house belongs only to an air-to-air heat pump, which heats as well as cools.

What Ealing has decided

There are 108 determined applications on Ealing's record whose description names a condenser, air conditioning or similar plant, of which 98 were approved and 10 refused.

Ealing's record holds 35 more that never reached a determination, whether because they remain live or because the applicant pulled them. Everything below excludes them, so the rate describes determined cases only.

The success rate across all 108 rulings, spanning every development type, is 90.7%, and 49 of those 108 came from households. A council that says yes far more often than no, and still says no.

The scope matters as much as the number. Commercial and mixed-use plant makes up a large share of any council's cooling caseload, so an all-development rate is a weaker guide to a domestic application than its size suggests.

Householder applications alone: 45 of 49 approved, 91.8%. Few councils have decided enough domestic cooling applications for this figure to be worth publishing, and Ealing is one that has.

The air-to-air heat pump, which heats as well as cools and is the only equipment that can be permitted development on a house, appears in none of Ealing's decided applications by name. Nationally the count is similarly close to zero: this is a category planning departments have barely met.

Air-source heat pumps, counted separately

There is little to choose between the two here: 90.3% of the 72 decided applications mentioning an air-source heat pump were approved by Ealing, a whisker from its cooling-plant record.

These two figures are never added, averaged or read as one. Most air-source schemes heat rather than cool, and an application mentioning both sits in both counts.

The distinction is the whole point: an air-to-air heat pump, which heats as well as cools, can be permitted development on a house, and a cooling-only unit cannot.

The rule these decisions are made under

Since 2025-05-29, England's permitted-development rules let a house fit an air-to-air heat pump, which heats as well as cools, without a planning application in many cases, within set size, siting and noise limits. A unit that only cools has no equivalent route and needs a full application whatever the property.

That is why the decisions above matter more than they would have before the change. Every cooling-only installation now crosses a planning officer's desk, so the council's posture is not background information, it is the decision.

Flats are the sharpest exception, here as everywhere in England: the permitted-development right for an outdoor unit belongs to the house rather than to a flat within it, so a flat will usually need freeholder or managing-agent consent as well as planning permission.

What gets refused, and what gets attached

What those refusals were FOR is a national question at the volume of officer reasoning currently published, not a council-level one, and we do not pretend otherwise. Both findings are set out with their sample sizes: why cooling applications get refused and the conditions councils attach to an approval.

Every council we can publish a figure for is listed on the council index.

What this data does not show

Applications are identified from their own description, so every count on these pages means applications mentioning cooling equipment, not every cooling installation in the area. An application that fitted the same kit but described it as external plant is not in these figures, which makes them a floor on activity rather than a census.

Each application is assigned to Ealing through the postcode on the application itself. Of the 143 applications recorded for this authority, 100% carry a location we could resolve; nationally 1738 of 19260 applications could not be tied to a district at all and sit outside every figure on this site rather than being quietly assigned somewhere.

What this page cannot tell you is what will happen at your address. It has no view of your elevation, your neighbours' windows, whether your home sits in a conservation area, or whether it is a listed building - and a neighbour's approval settles none of those. This is indicative guidance drawn from public planning records, not legal advice: confirm the final position with your Local Planning Authority before you install.

Planning figures are computed from decided planning applications published by UK local planning authorities on their statutory planning registers, aggregated via PlanIt. Contains public sector information licensed under the Open Government Licence v3.0. Figures are indicative and are not a statement by any council. Data as of September 2026. See all data sources.

Recent decisions you can check yourself

These are real applications Ealing has decided, taken from its own statutory planning register. Every one links back to the council's entry, so nothing here has to be taken on trust.

12 most recent of 172 decided

  • Ealing/262863HHApproved with conditions

    Installation of two air conditioning units to rear elevation...

    EalingDecided 18 September 2026Authority record
  • 26/0123/AODOPDCApproved

    Discharge of condition 4 (Cycle Parking Details) pursuant to planning permission reference 26/0011/FULOPDC dated...

    EalingDecided 18 September 2026Authority record
  • Ealing/262640HHRefused

    Two storey side/rear infill extension; first floor rear extension; replacement of all existing windows and external...

    EalingDecided 27 August 2026Householder applicationAuthority record
  • Ealing/263016OPDCOBApproved

    Discharge of condition 4 (Cycle Parking Details) pursuant to planning permission reference 26/0011/FULOPDC dated...

    EalingDecided 20 August 2026Authority record
  • Ealing/262170HHApproved with conditions

    Installation of air conditioning condenser unit to the rear (Retrospective)...

    EalingDecided 17 August 2026Householder applicationAuthority record
  • Ealing/262593NMAApproved

    Application for a Non-Material Amendment in (S96a) seeking to allow drawing amendments in relation to planning...

    EalingDecided 7 August 2026Authority record
  • Ealing/261681CNDApproved

    Details of the Noise Assessment pursuant to condition 5 of planning permission 252548HH dated 06.11.2025 for 'Rear roof...

    EalingDecided 3 August 2026Authority record
  • Ealing/261369HHApproved with conditions

    Single storey side/rear extension; wall mounted air conditioning unit on rear elevation...

    EalingDecided 27 July 2026Householder applicationAuthority record
  • Ealing/262531NMAApproved

    Application for non-material amendment to planning permission reference 254771HH dated 13.02.2026 'Single storey rear...

    EalingDecided 24 July 2026Authority record
  • Ealing/262159CPLApproved

    Installation of air conditioning unit to rear elevation (Lawful Development Certificate for a Proposed Development)...

    EalingDecided 23 July 2026Authority record
  • Ealing/254353FULApproved with conditions

    Installation of the buffer vessels, air source heat pumps; installation of fence to north elevation...

    EalingDecided 20 July 2026Householder applicationAuthority record
  • Ealing/261255HHApproved with conditions

    Single storey rear extension to the existing rear extension including the enlargement of the existing roof terrace...

    EalingDecided 3 July 2026Householder applicationAuthority record

160 further decided applications are held for Ealing and counted in the figures above. They are not listed here to keep the page readable, not because they say anything different.

Statutory planning-register entries published by Ealing. Applicant, agent and case-officer names and full addresses are not shown. Descriptions are the applicant's own wording, shortened. Each entry links to the council's own register, which is the authoritative record.

Planning-application data

The applications listed here are entries on the statutory planning register of the named local planning authority, kept under section 69 of the Town and Country Planning Act 1990 and article 40 of the Town and Country Planning (Development Management Procedure) (England) Order 2015. Aggregate figures on this page contain public sector information licensed under the Open Government Licence v3.0.

We show only the application reference, a shortened description, the decision and its date. We do not show applicant, agent or case-officer names, or full addresses. We publish decided applications only. The council's own register is the authoritative record and every entry links to it; where this page and the council disagree, the council is right.

GetComfort is not a planning authority and this is not planning advice. If an entry here concerns your property and you would like it removed, email [email protected] and we will remove it. See all data sources.

Check your own Ealing home

Enter your address for a property-specific planning verdict, the right cooling system, and an indicative cost.

  1. Address
  2. Confirm
  3. Questions
  4. Plan

Let's look at your home

We use property data to pre-fill the boring bits - no long forms, and we never cold-call you.

Frequently asked questions

Does Ealing approve air conditioning applications?

On the 108 decisions we hold, Ealing approved 90.7%. The figure spans every development type and 49 of those decisions were householder applications, which is why it should be read as a posture rather than a probability for one home.

Do I need planning permission for air conditioning?

For a cooling-only unit, yes, always. Since May 2025 the permitted-development route on a house is open only to an air-to-air heat pump, which heats as well as cools; a unit that only cools is excluded from it entirely and needs a full application. Flats are a further exception, because the permitted-development right sits with the house rather than the flat within it.

How many air conditioning applications has Ealing refused?

10, out of 108 decided applications mentioning cooling plant. The outcomes are on the record; the reasons behind them mostly are not, so this page describes what happened rather than why.

Is this the approval rate for homes, or for all buildings?

Both are on this page and they are kept apart. The headline covers all development types across 108 decisions; the householder-only rate is 91.8% across 49 decisions, and that is the one closest to a domestic case.

Every home is different - your floor, aspect, EPC band, heating type and conservation status all change the answer. Our free cooling checker pre-fills your home from public property data (EPC and UPRN records) and answers the same question for your specific Ealing address rather than for the borough, and returns the right cooling system and an indicative cost with it. No phone call, no waiting.

Check my home

You will see your full cooling plan instantly. If you would like us to email it to you, or to have a single accredited local installer contact you about a free survey, you choose that at the end - we only get in touch if you ask.

This is indicative planning guidance drawn from public records, not legal advice - always confirm the final position with your Local Planning Authority (LPA) before you install. Every figure above follows our published methodology.

More on planning and cooling in Ealing