East Lindsey · planning decisions

East Lindsey: cooling planning decisions

Written by Solomon Amos.

Sources: CIBSE TM59, Building Regs Part O, gov.uk Boiler Upgrade Scheme, and MCS (the certification scheme for registered installers) - see methodology

Last checked against current grant rules on 14 August 2026

Quick answer

Approval is the norm. Out of 27 determined applications naming air conditioning or a condenser, East Lindsey said yes to 25, which is 92.6%, and 4 of the 27 were domestic. A cooling-only unit still needs a full planning application, because the permitted-development route on a house belongs only to an air-to-air heat pump, which heats as well as cools.

What East Lindsey has decided

East Lindsey sits close to our publication floor. It has issued 27 cooling determinations, counting applications that say so in their own wording, splitting 25 to 2 in the applicant's favour, so read what follows as a first indication rather than a settled pattern.

East Lindsey's record holds 5 more that never reached a determination, whether because they remain live or because the applicant pulled them. Everything below excludes them, so the rate describes determined cases only.

92.6% of the 27 decisions were approvals, a figure covering all development types and 4 householder applications. The refusals behind the remaining share are real rather than rounding.

The scope matters as much as the number. Commercial and mixed-use plant makes up a large share of any council's cooling caseload, so an all-development rate is a weaker guide to a domestic application than its size suggests.

We stop short of a householder-only percentage for East Lindsey. At 4 decided householder applications the sample is too thin, and a rate drawn from it would read as far more certain than the evidence allows.

The air-to-air heat pump, which heats as well as cools and is the only equipment that can be permitted development on a house, appears in none of East Lindsey's decided applications by name. Nationally the count is similarly close to zero: this is a category planning departments have barely met.

Air-source heat pumps, counted separately

The heating case travels further here than the cooling one: 100% of 34 decided applications mentioning an air-source heat pump were approved by East Lindsey, ahead of its cooling-plant record.

These two figures are never added, averaged or read as one. Most air-source schemes heat rather than cool, and an application mentioning both sits in both counts.

The distinction is the whole point: an air-to-air heat pump, which heats as well as cools, can be permitted development on a house, and a cooling-only unit cannot.

The rule these decisions are made under

Since 2025-05-29, England's permitted-development rules let a house fit an air-to-air heat pump, which heats as well as cools, without a planning application in many cases, within set size, siting and noise limits. A unit that only cools has no equivalent route and needs a full application whatever the property.

That is why the decisions above matter more than they would have before the change. Every cooling-only installation now crosses a planning officer's desk, so the council's posture is not background information, it is the decision.

Flats are the sharpest exception, here as everywhere in England: the permitted-development right for an outdoor unit belongs to the house rather than to a flat within it, so a flat will usually need freeholder or managing-agent consent as well as planning permission.

What gets refused, and what gets attached

What those refusals were FOR is a national question at the volume of officer reasoning currently published, not a council-level one, and we do not pretend otherwise. Both findings are set out with their sample sizes: why cooling applications get refused and the conditions councils attach to an approval.

Every council we can publish a figure for is listed on the council index.

What this data does not show

Applications are identified from their own description, so every count on these pages means applications mentioning cooling equipment, not every cooling installation in the area. An application that fitted the same kit but described it as external plant is not in these figures, which makes them a floor on activity rather than a census.

Each application is assigned to East Lindsey through the postcode on the application itself. Of the 32 applications recorded for this authority, 100% carry a location we could resolve; nationally 1738 of 19260 applications could not be tied to a district at all and sit outside every figure on this site rather than being quietly assigned somewhere.

What this page cannot tell you is what will happen at your address. It has no view of your elevation, your neighbours' windows, whether your home sits in a conservation area, or whether it is a listed building - and a neighbour's approval settles none of those. This is indicative guidance drawn from public planning records, not legal advice: confirm the final position with your Local Planning Authority before you install.

Planning figures are computed from decided planning applications published by UK local planning authorities on their statutory planning registers, aggregated via PlanIt. Contains public sector information licensed under the Open Government Licence v3.0. Figures are indicative and are not a statement by any council. Data as of September 2026. See all data sources.

Recent decisions you can check yourself

These are real applications East Lindsey has decided, taken from its own statutory planning register. Every one links back to the council's entry, so nothing here has to be taken on trust.

12 most recent of 61 decided

  • EastLindsey/02882/25/FULApproved

    Planning Permission - Alterations to existing office building to provide a pitched roof over an existing flat roof and...

    East LindseyDecided 24 September 2025Authority record
  • EastLindsey/02058/25/FULApproved

    Planning Permission - Change of use of former hardware store to a mixed use falling within Use Class E (c)(i) Financial...

    East LindseyDecided 14 August 2025Authority record
  • EastLindsey/02539/25/FULApproved

    Planning Permission - Extension to existing guest house to provide a store and to include the repositioning of existing...

    East LindseyDecided 5 August 2025Householder applicationAuthority record
  • EastLindsey/S/153/01335/24Approved

    Planning Permission - Installation of 3 no. external air source heat pump units.

    East LindseyDecided 23 October 2024Authority record
  • EastLindsey/N/105/01343/24Approved

    Planning Permission - Installation of 4 no. external condenser units (works already started).

    East LindseyDecided 25 September 2024Authority record
  • EastLindsey/S/051/01048/24Approved

    Planning Permission - Installation of 6no. roof mounted solar panels and air source heat pump on existing dwelling...

    East LindseyDecided 6 September 2024Householder applicationAuthority record
  • EastLindsey/S/086/00915/24Approved

    Planning Permission - Change of Use from Class B1, B8 to Ambulance Station with staff facilities with associated energy...

    East LindseyDecided 20 August 2024Authority record
  • EastLindsey/N/089/00739/24Approved

    Planning Permission - Alterations to existing dwelling to install an air source heat pump to front of property.

    East LindseyDecided 12 July 2024Householder applicationAuthority record
  • EastLindsey/N/105/00370/24Approved

    Planning Permission - Alterations to the existing building to provide an additional shop front and side door to serve a...

    East LindseyDecided 3 May 2024Authority record
  • EastLindsey/N/163/02254/23Approved

    Planning Permission - Conversion of and alterations of the existing farmhouse which is a listed building and curtilage...

    East LindseyDecided 8 April 2024Authority record
  • EastLindsey/N/163/02256/23Approved

    Planning Permission - Extension and alterations to part of the ground floor and domestic outbuilding to the north of...

    East LindseyDecided 8 April 2024Householder applicationAuthority record
  • EastLindsey/N/163/02257/23Approved

    Listed Building Consent - Extension and alterations to part of the ground floor and domestic outbuilding to the north...

    East LindseyDecided 8 April 2024Authority record

49 further decided applications are held for East Lindsey and counted in the figures above. They are not listed here to keep the page readable, not because they say anything different.

Statutory planning-register entries published by East Lindsey. Applicant, agent and case-officer names and full addresses are not shown. Descriptions are the applicant's own wording, shortened. Each entry links to the council's own register, which is the authoritative record.

Planning-application data

The applications listed here are entries on the statutory planning register of the named local planning authority, kept under section 69 of the Town and Country Planning Act 1990 and article 40 of the Town and Country Planning (Development Management Procedure) (England) Order 2015. Aggregate figures on this page contain public sector information licensed under the Open Government Licence v3.0.

We show only the application reference, a shortened description, the decision and its date. We do not show applicant, agent or case-officer names, or full addresses. We publish decided applications only. The council's own register is the authoritative record and every entry links to it; where this page and the council disagree, the council is right.

GetComfort is not a planning authority and this is not planning advice. If an entry here concerns your property and you would like it removed, email [email protected] and we will remove it. See all data sources.

Check your own East Lindsey home

Enter your address for a property-specific planning verdict, the right cooling system, and an indicative cost.

  1. Address
  2. Confirm
  3. Questions
  4. Plan

Let's look at your home

We use property data to pre-fill the boring bits - no long forms, and we never cold-call you.

Frequently asked questions

Does East Lindsey approve air conditioning applications?

On the 27 decisions we hold, East Lindsey approved 92.6%. The figure spans every development type and 4 of those decisions were householder applications, which is why it should be read as a posture rather than a probability for one home.

Do I need planning permission for air conditioning?

For a cooling-only unit, yes, always. Since May 2025 the permitted-development route on a house is open only to an air-to-air heat pump, which heats as well as cools; a unit that only cools is excluded from it entirely and needs a full application. Flats are a further exception, because the permitted-development right sits with the house rather than the flat within it.

How many air conditioning applications has East Lindsey refused?

Only 2, from 27 decided applications mentioning cooling plant. Too small a number to generalise from, so there is no refusal-grounds section on this page.

Is this the approval rate for homes, or for all buildings?

All buildings. Commercial and mixed-use schemes are a large share of any cooling caseload, and East Lindsey has decided 4 householder applications, which is below the sample size we publish a separate domestic rate from. The count is disclosed so you can see the denominator you are actually working with.

Every home is different - your floor, aspect, EPC band, heating type and conservation status all change the answer. Our free cooling checker pre-fills your home from public property data (EPC and UPRN records) and takes it from the council's record down to your own address in East Lindsey, with a property-specific planning verdict, the right cooling system for your home, and an indicative cost. No phone call, no waiting.

Check my home

You will see your full cooling plan instantly. If you would like us to email it to you, or to have a single accredited local installer contact you about a free survey, you choose that at the end - we only get in touch if you ask.

This is indicative planning guidance drawn from public records, not legal advice - always confirm the final position with your Local Planning Authority (LPA) before you install. Every figure above follows our published methodology.

More on planning and cooling in East Lindsey