Skip to main content

Westminster · planning decisions

Westminster: cooling planning decisions

Written by Solomon Amos.

Sources: CIBSE TM59, Building Regs Part O, gov.uk Boiler Upgrade Scheme, and MCS (the certification scheme for registered installers) - see methodology

Last checked against current grant rules on 14 August 2026

Quick answer

Usually. Westminster approved 313 of the 336 cooling-plant applications it has decided, a rate of 93.2% spanning every development type and including 151 householder cases. A cooling-only unit still needs a full planning application, because the permitted-development route on a house belongs only to an air-to-air heat pump, which heats as well as cools.

What Westminster has decided

The record for Westminster is unusually substantial: 336 determined applications whose description names a condenser, air conditioning or similar plant, 313 of them approved and 23 refused.

Westminster's record holds 212 more that never reached a determination, whether because they remain live or because the applicant pulled them. Everything below excludes them, so the rate describes determined cases only.

93.2% of the 336 decisions were approvals, a figure covering all development types and 151 householder applications. The refusals behind the remaining share are real rather than rounding.

The scope matters as much as the number. Commercial and mixed-use plant makes up a large share of any council's cooling caseload, so an all-development rate is a weaker guide to a domestic application than its size suggests.

Householder applications alone: 141 of 151 approved, 93.4%. Few councils have decided enough domestic cooling applications for this figure to be worth publishing, and Westminster is one that has.

The air-to-air heat pump, which heats as well as cools and is the only equipment that can be permitted development on a house, appears in none of Westminster's decided applications by name. Nationally the count is similarly close to zero: this is a category planning departments have barely met.

Air-source heat pumps, counted separately

There is little to choose between the two here: 91.7% of the 109 decided applications mentioning an air-source heat pump were approved by Westminster, a whisker from its cooling-plant record.

These two figures are never added, averaged or read as one. Most air-source schemes heat rather than cool, and an application mentioning both sits in both counts.

The distinction is the whole point: an air-to-air heat pump, which heats as well as cools, can be permitted development on a house, and a cooling-only unit cannot.

The rule these decisions are made under

Since 2025-05-29, England's permitted-development rules let a house fit an air-to-air heat pump, which heats as well as cools, without a planning application in many cases, within set size, siting and noise limits. A unit that only cools has no equivalent route and needs a full application whatever the property.

That is why the decisions above matter more than they would have before the change. Every cooling-only installation now crosses a planning officer's desk, so the council's posture is not background information, it is the decision.

Flats are the sharpest exception, here as everywhere in England: the permitted-development right for an outdoor unit belongs to the house rather than to a flat within it, so a flat will usually need freeholder or managing-agent consent as well as planning permission.

What gets refused, and what gets attached

What those refusals were FOR is a national question at the volume of officer reasoning currently published, not a council-level one, and we do not pretend otherwise. Both findings are set out with their sample sizes: why cooling applications get refused and the conditions councils attach to an approval.

Every council we can publish a figure for is listed on the council index.

What this data does not show

Applications are identified from their own description, so every count on these pages means applications mentioning cooling equipment, not every cooling installation in the area. An application that fitted the same kit but described it as external plant is not in these figures, which makes them a floor on activity rather than a census.

Each application is assigned to Westminster through the postcode on the application itself. Of the 548 applications recorded for this authority, 99.8% carry a location we could resolve; nationally 1738 of 19260 applications could not be tied to a district at all and sit outside every figure on this site rather than being quietly assigned somewhere.

What this page cannot tell you is what will happen at your address. It has no view of your elevation, your neighbours' windows, whether your home sits in a conservation area, or whether it is a listed building - and a neighbour's approval settles none of those. This is indicative guidance drawn from public planning records, not legal advice: confirm the final position with your Local Planning Authority before you install.

Planning figures are computed from decided planning applications published by UK local planning authorities on their statutory planning registers, aggregated via PlanIt. Contains public sector information licensed under the Open Government Licence v3.0. Figures are indicative and are not a statement by any council. Data as of September 2026. See all data sources.

Recent decisions you can check yourself

These are real applications Westminster has decided, taken from its own statutory planning register. Every one links back to the council's entry, so nothing here has to be taken on trust.

12 most recent of 420 decided

  • 26/01095/FULLApproved

    Excavation and construction of a new basement; use of the garage for additional internal accommodation; landscaping of...

    WestminsterDecided 18 August 2026Authority record
  • 25/07228/FULLApproved

    Installation of three new air-conditioning units within an acoustic enclosure in the rear basement lightwell, and...

    WestminsterDecided 21 July 2026Householder applicationAuthority record
  • 24/08329/FULLRefused

    Erection of roof extensions, with associated rear terraces and fire escapes (including fire escape spiral stair to...

    WestminsterDecided 16 July 2026Authority record
  • 25/08951/FULLApproved

    Replacement of windows; installation of air conditioning condenser units and acoustic screen at rear lower ground floor...

    WestminsterDecided 14 July 2026Householder applicationAuthority record
  • 25/08952/LBCApproved

    Replacement of windows; installation of air conditioning condenser units and acoustic screen at rear lower ground floor...

    WestminsterDecided 14 July 2026Householder applicationAuthority record
  • 26/01832/LBCApproved

    Demolition of existing rear conservatory and erection of a single storey rear extension, installation of...

    WestminsterDecided 8 July 2026Authority record
  • 25/07550/FULLApproved

    Refurbishment including the creation of a new lightwell atrium, terrace, facade treatments, and replacement rooflights...

    WestminsterDecided 26 June 2026Householder applicationAuthority record
  • 25/07551/LBCApproved

    Refurbishment including the creation of a new lightwell atrium,terrace, facade treatments, and replacement rooflights...

    WestminsterDecided 26 June 2026Householder applicationAuthority record
  • 25/07546/NMAApproved

    Amendments to planning permission dated 23 June 2015 (Ref: 15/00132/FULL) for, 'Excavation beneath footprint of...

    WestminsterDecided 25 June 2026Authority record
  • 25/07616/FULLApproved

    Installation of two new air conditioning units at roof level. (Linked with 25/07617/LBC)...

    WestminsterDecided 17 June 2026Authority record
  • 25/07617/LBCApproved

    Installation of two new air conditioning units at roof level. Linked with 25/07616/FULL...

    WestminsterDecided 17 June 2026Authority record
  • 26/02141/FULLApproved

    Upgrades and enhancements to the existing Fly Tower, including alterations to the external fabric of the Fly Tower...

    WestminsterDecided 9 June 2026Authority record

408 further decided applications are held for Westminster and counted in the figures above. They are not listed here to keep the page readable, not because they say anything different.

Statutory planning-register entries published by Westminster. Applicant, agent and case-officer names and full addresses are not shown. Descriptions are the applicant's own wording, shortened. Each entry links to the council's own register, which is the authoritative record.

Planning-application data

The applications listed here are entries on the statutory planning register of the named local planning authority, kept under section 69 of the Town and Country Planning Act 1990 and article 40 of the Town and Country Planning (Development Management Procedure) (England) Order 2015. Aggregate figures on this page contain public sector information licensed under the Open Government Licence v3.0.

We show only the application reference, a shortened description, the decision and its date. We do not show applicant, agent or case-officer names, or full addresses. We publish decided applications only. The council's own register is the authoritative record and every entry links to it; where this page and the council disagree, the council is right.

GetComfort is not a planning authority and this is not planning advice. If an entry here concerns your property and you would like it removed, email [email protected] and we will remove it. See all data sources.

Check your own Westminster home

Enter your address for a property-specific planning verdict, the right cooling system, and an indicative cost.

  1. Address
  2. Confirm
  3. Questions
  4. Plan

Let's look at your home

We use property data to pre-fill the boring bits - no long forms, and we never cold-call you.

Frequently asked questions

Does Westminster approve air conditioning applications?

93.2% of the 336 applications mentioning cooling plant that Westminster has decided were approved. That covers all development types and includes 151 householder applications, so read it as the council's general posture rather than as your own odds.

Do I need planning permission for air conditioning?

For a cooling-only unit, yes, always. Since May 2025 the permitted-development route on a house is open only to an air-to-air heat pump, which heats as well as cools; a unit that only cools is excluded from it entirely and needs a full application. Flats are a further exception, because the permitted-development right sits with the house rather than the flat within it.

How many air conditioning applications has Westminster refused?

23 of the 336 decided applications mentioning cooling plant were refused. We hold the outcomes but not, for the most part, the officer's written reasoning, so we do not claim to know what Westminster specifically objects to.

Is this the approval rate for homes, or for all buildings?

Both are on this page and they are kept apart. The headline covers all development types across 336 decisions; the householder-only rate is 93.4% across 151 decisions, and that is the one closest to a domestic case.

Every home is different - your floor, aspect, EPC band, heating type and conservation status all change the answer. Our free cooling checker pre-fills your home from public property data (EPC and UPRN records) and answers the same question for your specific Westminster address rather than for the borough, and returns the right cooling system and an indicative cost with it. No phone call, no waiting.

Check my home

You will see your full cooling plan instantly. If you would like us to email it to you, or to have a single accredited local installer contact you about a free survey, you choose that at the end - we only get in touch if you ask.

This is indicative planning guidance drawn from public records, not legal advice - always confirm the final position with your Local Planning Authority (LPA) before you install. Every figure above follows our published methodology.

More on planning and cooling in Westminster