Skip to main content

Oldham · cooling guide

How to cool a new build in Oldham

Written by Solomon Amos.

Sources: CIBSE TM59, Building Regs Part O, gov.uk Boiler Upgrade Scheme, and MCS (the certification scheme for registered installers) - see methodology

Last checked against current grant rules on 14 August 2026

Quick answer

Overheating risk for the typical Oldham new build is moderate, so the usual fix is air-to-air heat pump, about £2,800-£3,220 installed. An air-to-air heat pump replacing qualifying fossil-fuel or electric heating can attract a grant through an accredited installer; kept alongside your boiler it is private-pay. Check your address for the exact verdict.

Just 476 new builds appear on Oldham's EPC register, in a borough where about 36% of homes were built before 1919. Modern and lightweight, these post-2000 properties have less thermal mass than the older stock around them, so they warm through faster on sunny days. Many already run direct-electric heating, which affects which cooling system suits them best.

If your Oldham new build turns into an oven every summer, you are not imagining it - and although new builds are a smaller share of the borough (about 476 homes, 0.4%), they overheat about as reliably as any home type here. On our overheating scale a typical Oldham new build lands near 48 out of 100 - "moderate" - meaning the fan-and-open-window routine stops coping once real heat arrives. What follows is the answer for your actual property: the system that fits, what it should cost, and where you stand on planning - all before you contact an installer.

Why new builds in Oldham overheat

A new build has the reverse problem to an old one. The tight, heavily insulated shell that holds winter warmth in is just as good at keeping summer heat from escaping, so once sun through large windows and everyday internal heat build up indoors, there is no easy way out. A single-aspect flat, with openings on one side only, cannot draw a cross-draught to shift it. The issue is common enough now that Part O of the Building Regulations sets overheating limits for new homes directly. More insulation would only make things worse; what a home like this needs is mechanical cooling, and a unit that cools in summer and heats efficiently in winter fits a new build that frequently has no gas connection at all. For a typical Oldham new build, the median floor area is around 99 sqm - over that footprint of sealed, airtight construction, the trapped heat described above has nowhere to go once the windows are shut.

New builds in Oldham: by the numbers

0% of Oldham homes are new builds

476 of 109,114

99 m²

median floor area

£327

median annual heating cost

EPC band distribution

476 new builds in Oldham with an EPC on record

10%
89%
1%
0%
0%
0%
0%

Greener bands are more energy-efficient; red bands (E-G) are poorer-fabric homes that trap summer heat.

EPC band distribution for new builds in Oldham
EPC bandHomesShare
A4910%
B42489%
C31%
D00%
E00%
F00%
G00%

When these homes were built

Construction era of 459 new builds in Oldham

  • pre-1919 0%
  • 1919-1944 0%
  • 1945-1999 0%
  • 2000+ 100%
Construction-era mix for new builds in Oldham
EraHomesShare
pre-191900%
1919-194400%
1945-199900%
2000+459100%

Real EPC and property-intelligence data via HomePortfolio, aggregated for new builds in Oldham. Data as of 11 July 2026.

What those figures mean for your cooling is the real story: the fabric is on the efficient side, great for heating costs yet quick to trap warmth once a heatwave sets in, and these are predominantly modern-build stock, tight enough that once heat gets in it has nowhere to go - which is why the overheating bites harder here than the weather alone suggests. Oldham is a town where a large share of solid-walled pre-1919 stock warms slowly but then holds onto that heat long after a hot spell arrives; locally, air quality (PM2.5) averages about 7.4 µg/m³ and daytime noise around 41 dB - the factors that decide whether opening a window at night can replace running a cooling system. This is historic ground, too: a small share of these homes sit inside a conservation area - which is why the planning route for an outdoor unit needs more care here than the approval rate alone suggests. Being near a listed building is not the same as your home being listed.

What the data says about new builds in Oldham

Look past the address at what the stock is actually made of. Across Oldham, new builds cluster at EPC band B - 89% of them sit there. That is an efficient rating on paper, yet it works against winter heat loss, not summer heat gain, so it barely touches the overheating problem. The full spread reads 89% at band B, 10% at band A, 1% at band C, so the picture is a range, not a single rating. 100% were built since 2000, so this is mostly lightweight, airtight modern construction - fabric that traps heat as effectively as it keeps it in.

Can you cool this home by opening a window at night?

The next question is whether free night ventilation is realistic here. At around 41 dB it is quiet enough that opening windows overnight is a genuine first line of defence, worth exhausting before you spend on active cooling. Local PM2.5 air quality, around 7.4 µg/m³, is not the limiting factor.

How the planning numbers look in Oldham

For the planning side, conservation coverage is light for this stock: 13 of 476 new builds profiled in Oldham, about 3%, leaving most of them clear of it. In conservation areas such as Denshaw and New Delph, expect the external siting to draw more scrutiny.

A worked cooling plan for a typical new build

Worked example · a typical new build in Oldham

0out of 100Moderate overheating risk

Recommended system

Air-to-air heat pump

Cools in summer and heats in winter - the only cooling system the £2,500 grant can fund.

Replacing your direct-electric heating with an air-to-air heat pump cools in summer and heats in winter, and qualifies for the £2,500 Boiler Upgrade Scheme grant when installed by an MCS-certified installer.

Installer: MCS-certified

Boiler Upgrade Scheme

£0 grant - eligible

Eligible: replacing your direct-electric heating with an air-to-air heat pump via an MCS-certified installer qualifies for the £2,500 Boiler Upgrade Scheme grant.

Not claimable yet

The grant itself is law and your eligibility is real, but no air-to-air product has reached the MCS Product Directory yet, so no installer can issue a Boiler Upgrade Scheme voucher today. Air-to-air enters MCS scheme scope on 5 December 2026, and vouchers follow once certified products list. Get quotes now, but treat the grant as pending rather than banked.

  • Installed by an MCS-certified installer
  • Residential property only
  • Existing qualifying heating system is decommissioned, not retained alongside the new system
  • Not combined with another government heating grant for the same install
  • Air-to-air products must be listed on the MCS Product Directory before a voucher can be issued - not yet the case

Indicative cost

Typical install
£2,800–£3,220
Less grant
−£2,500
You pay
£300–£720
  • Indicative UK install cost, sourced from 2026 trade guides - actual quotes vary by property and installer.
  • Net cost shown after the £2,500 Boiler Upgrade Scheme grant.

Planning permission likely needed

  • The permitted-development right for a heat pump sits with the whole building, not the individual flat - you will usually need freeholder/management-company consent, and in practice that means a full planning application in most cases.
  • External condenser units must meet permitted-development noise limits regardless of planning route.
  • This is an indicative assessment only - always confirm the final position with your Local Planning Authority (LPA) before installing.
  • Listed-building status was not confirmed - if this building is also listed, listed-building consent will additionally be required.

Illustrative only. Your own floor, aspect, heating and conservation status change the result - check your specific address below.

The right system, and the £2,500 grant honestly

An outdoor air-source heat-pump condenser unit installed beside a home

For most Oldham new builds, the strongest option is an air-to-air heat pump - a modern high-wall or ceiling unit, the same hardware people loosely call "air conditioning", except it heats as well as cools. It is near-silent, controllable room by room, and because it does both jobs it can replace your existing heating entirely. There are two honest ways this plays out, and which one applies to you turns on a single decision: whether you replace your heating or keep it. For context, a typical Oldham new build runs around 99 sqm and already costs about £327 a year to heat - the baseline the figures below are measured against.

Branch 1 - replace your direct-electric heating, and the £2,500 grant is in play. The £2,500 air-to-air grant (Boiler Upgrade Scheme) only pays when the heat pump replaces your fossil-fuel or electric heating and is fitted by an MCS-certified installer. So if you take out your existing system and let the air-to-air heat pump handle your heating as well as your cooling, a job costing around £2,800-£3,220 installed can come down to roughly £300-£720 net. Eligibility is per-property and depends on your current heating and the installer's accreditation - our checker confirms it against your address. (Grant rules as of August 2026 and subject to change.)

Branch 2 - keep your boiler and simply add cooling, and the grant does not apply. If you want to keep your existing heating and only add cooling, that is a private-pay job - a cooling-only add-on that keeps your boiler is not eligible for the £2,500 grant, whatever your heating type. The sensible choice here is usually a single-split air conditioning unit (around £1,500-£3,000 installed), carried out by an F-Gas / REFCOM-registered engineer - not MCS, which applies only to the grant-eligible heat-pump route above.

We match you to the right accreditation for whichever path fits your home: MCS for the grant-eligible heat pump, F-Gas / REFCOM for a pure cooling install. For a typical new build in Oldham at around 99 sqm, sized to that footprint, our checker leans toward air-to-air heat pump, but your own floor, aspect and heating decision move the answer - which is the whole point of checking your specific address.

What cooling costs in Oldham in 2026

Air-to-air heat pump versus single-split air conditioning: cost, grant eligibility and installer accreditation, for a 2-room home.
Air-to-air heat pumpSingle-split AC
What it doesCools in summer and heats in winterCools only
Typical install cost£2,800 - £3,220£1,500 - £3,000
The £2,500 grantIf you replace fossil-fuel or electric heating, via an MCS installerNot eligible
Cost after grant£300 - £720 (if eligible)£1,500 - £3,000
Installer accreditationMCSF-Gas / REFCOM
Indicative UK install costs for a 2-room home, from 2026 trade-guide bands - actual quotes vary by property and installer. The grant applies only when an air-to-air heat pump replaces qualifying heating.

Planning permission in Oldham

Oldham's genuinely low conservation-area coverage works in your favour on planning. A house fitting an outdoor condenser usually clears permitted development without extra paperwork, though flats do not get the same automatic route and typically still need Oldham Council's permission for a front or side unit. In Oldham, conservation areas such as Denshaw, New Delph and Hey are where this bites hardest. One recent rule change matters here. As of May 2025 an air-to-air heat pump counts as a heat pump for planning, so a house can often install one under permitted development within the size and siting limits - whereas a pure cooling unit, which only cools, still needs a full planning application. Which system fits your home therefore decides which planning route you are on. For a typical new build here, our checker's read is: planning permission is likely required. External condenser units must meet permitted-development noise limits regardless of planning route. This is an indicative assessment only - always confirm the final position with your Local Planning Authority (LPA) before installing. Listed-building status was not confirmed - if this building is also listed, listed-building consent will additionally be required. Oldham carries genuinely low conservation-area coverage (about 4% of EPC-certified homes), which makes an external unit a lower-friction proposition here than in a heritage-dense borough for most addresses - a real advantage, not a workaround. It is very doable - Oldham Council approves plenty of these - but it is a step, not a formality, and it is exactly the kind of thing worth checking against your specific address before you commit. Treat this as indicative guidance, not legal advice.

3%

of new builds in Oldham sit inside a conservation area

0%

within 30 metres of a listed building

Conservation-area and listed-building status both tighten the planning route for an outdoor unit. Sitting near a listed building does not by itself make a home listed, so the checker confirms your property individually.

Conservation-area and listed-building records © Historic England 2026, via planning.data.gov.uk, used under the Open Government Licence v3.0. Data as of July 2026. See all data sources.

Permitted development, or a planning application?

An outdoor air-source heat-pump / air-conditioning condenser unit mounted beside a home

Air-to-air heat pump (heats and cools)

Can be permitted development

Can be permitted development on a house under Class G, within size, siting and noise limits, because since 29 May 2025 a unit that also heats is no longer excluded for cooling.

Pure air conditioning (cooling only)

Needs planning permission

Not permitted development - a cooling-only condenser fails the Class G "not solely for cooling" condition and there is no other PD class for it, so it needs a full planning application.

England permitted-development conditions for an outdoor unit: air-to-air heat pump versus cooling-only air conditioning.
Air-to-air heat pumpCooling-only AC
Does the permitted-development route apply?Yes on a house, within the Class G limits below (it heats as well as cools).No - a cooling-only unit needs full planning permission.
Property typeHouses get the Class G right directly. For a flat the right sits with the whole building (one unit for the block) and needs freeholder consent, so in practice a flat almost always needs permission.Planning permission required either way.
Maximum outdoor-unit sizeUp to 1.5 cubic metres on a house (0.6 cubic metres for a block of flats).Not applicable - planning permission required.
Number of unitsUp to two on a detached house; otherwise one.Not applicable - planning permission required.
Where it can goNot on a pitched roof; on a flat roof it must sit at least 1 metre from the edge; not on a wall above ground-floor level that faces a highway.Set by the planning application.
Conservation areaStricter - it must not go on any wall or roof that faces a highway, and an Article 4 direction can remove the right entirely.Planning permission required.
Listed buildingExcluded from permitted development; listed-building consent is needed regardless.Excluded from permitted development; listed-building consent is needed regardless.
NoiseMust pass the MCS Planning Standards (MCS 020) sound test, measured at the nearest neighbour's door or window.Any planning permission will set its own noise conditions.

England only, as of 29 May 2025 (reflects the 29 May 2025 Class G change, SI 2025/560). Sources: GPDO 2015, Schedule 2, Part 14, Class G (air source heat pumps); SI 2025/560 (the 2025 amendment).

This is an indicative summary of England permitted-development rules for outdoor units, not legal advice. Rules change and vary locally - confirm the final position with your Local Planning Authority before installing.

Common questions about cooling a new build

Does a top-floor or new build in Oldham really overheat?

Yes, and we can put a number on it: our model scores a typical Oldham new build at about 48 out of 100 ("moderate"). Oldham holds around 476 homes of this type - 0.4% of the borough's certified stock - and between roof heat gain, low thermal mass in older stock and the local heat-island effect, homes like this are routinely uncomfortable from late June, whatever the thermostat reads.

What is the best cooling system for a new build in Oldham?

For a Oldham new build, an air-to-air heat pump is generally the strongest pick - a quiet, room-by-room unit that both cools in summer and heats in winter. If you would rather leave your boiler in place and only add cooling, the usual private-pay option is a single-split air conditioning unit. Our checker points to air-to-air heat pump for a typical home here, but your own floor, aspect and heating choice can move it - so it pays to check your address. These new builds average around 99 sqm. A typical Oldham new build already costs around £327 a year to heat.

Can I get the £2,500 grant for cooling my Oldham home?

Only in one specific case, and it is worth being precise. You are eligible for the £2,500 air-to-air grant (Boiler Upgrade Scheme) only when an air-to-air heat pump replaces your fossil-fuel or electric heating and is fitted by an MCS-certified installer. If you keep your boiler and add cooling as an extra, that is a cooling-only add-on and it is not eligible for the £2,500 grant, whatever your heating type. Eligibility is per-property, so our checker confirms it against your address. (Grant rules as of August 2026 and subject to change.) Given a typical Oldham new build already costs around £327 a year to heat, replacing that heating as part of this route is usually where most of the saving comes from.

Do I need planning permission for air conditioning in Oldham?

More often than for a house, yes. The permitted-development rights that cover a house fitting an outdoor unit do not extend to flats the same way, and with conservation-area coverage common across Oldham, especially around Denshaw, a front or side condenser generally needs council consent. It is very achievable - a step to plan for rather than a given - and our checker shows the likely position for your exact address.

How much does it cost to cool a new build?

On 2026 UK trade prices as a rough guide: fitting an air-to-air heat pump here is around £2,800-£3,220, falling to roughly £300-£720 net when it replaces your heating and qualifies for the grant. A single-split air conditioning unit that leaves your boiler in place is about £1,500-£3,000 installed with no grant. Final quotes shift with access, unit size and pipe runs. A typical Oldham new build currently costs around £327 a year to heat. That heating bill sits alongside the cooling cost above, not instead of it.

MCS or F-Gas - which installer do I actually need?

It depends on the route, and getting it wrong is a common trap. The grant-eligible air-to-air heat pump route needs an MCS-certified installer - that accreditation is what the grant requires. A pure cooling install (a single-split, multi-split, ducted or portable unit that keeps your existing heating) needs an F-Gas / REFCOM-registered engineer, not MCS. We match you to the right accreditation for whichever path fits your home. This is a separate question from planning permission - Oldham Council handles that side, and accreditation is ours to get right.

If I use the checker, will you cold-call me?

No. The free cooling check shows your full plan on screen straightaway, with no phone call and no waiting. If you would like us to email your plan, or to have a single vetted local installer contact you about a survey, you choose that at the end - we only get in touch if you ask, and you are never sold to five companies at once.

Is air conditioning banned in new-build homes?

No, cooling a new-build is not banned. The mix-up comes from Building Regs Part O (which makes new homes limit overheating by design) and from lease or managing-agent rules on external units. Neither outlaws air conditioning; they just mean an outdoor condenser may need permission. The checker shows where you stand for your Oldham address.

What is Part O and does my new-build flat need to comply?

Part O is the Building Regs standard limiting overheating in new homes, judged by the CIBSE TM59 method. It governs how new dwellings are designed and built, so it is the developer's responsibility, not a retrofit. If your new-build overheats anyway - common in airtight flats - active cooling is a separate, unregulated option open to you.

Do I need my management company's permission to fit air conditioning in a new-build flat?

Frequently, yes. A new-build flat usually has a lease and a managing agent whose permission is needed for external changes such as a condenser. Request the process in writing early - it takes time - and keep it distinct from planning permission. The checker handles the planning side for your address.

What size outdoor unit can I fit under permitted development?

It depends on the system. Since 29 May 2025 (SI 2025/560), an air-to-air heat pump - which heats as well as cools - can be permitted development on a house: broadly a unit no larger than 1.5 cubic metres (0.6 cubic metres for a block of flats), and not on a wall above ground-floor level facing a highway, as long as you are not in a conservation area. A pure, cooling-only air conditioning unit does not get that route - it needs a full planning application whatever its size. Flats and conservation areas usually fall outside the permitted-development rights either way, so a unit there typically needs permission. The checker applies this to your address. In Oldham, that conservation-area exclusion bites hardest around places like Denshaw.

Does the air-to-air grant still apply if I add air conditioning but keep my gas boiler?

No. You are eligible for the £2,500 air-to-air grant (Boiler Upgrade Scheme) only when an air-to-air heat pump replaces your fossil-fuel or electric heating and is fitted by an MCS-certified installer. If you keep your boiler and add cooling as an extra, that cooling-only add-on is not eligible for the £2,500 grant, whatever your heating type - it is an F-Gas / REFCOM job instead. (Grant rules as of August 2026 and subject to change.) Given a typical Oldham new build already costs around £327 a year to heat, that saving is only available on the replace-your-heating route above.

Check your own Oldham home

Pre-scoped to a new build - enter your address for a plan specific to your property.

  1. Address
  2. Confirm
  3. Questions
  4. Plan

Let's look at your home

We use property data to pre-fill the boring bits - no long forms, and we never cold-call you.

Every home is different - your floor, aspect, EPC, heating type and conservation status all move the answer. Our free cooling checker pre-fills your home from public property data (EPC and UPRN records) and gives you a property-specific verdict on screen, straightaway: your overheating score, the right system, your real grant eligibility, the planning position and a net cost. No phone call, no waiting.

Check my Oldham home

You will see your full cooling plan instantly. If you would like us to email it to you, or to have a single vetted local installer contact you about a free survey, you choose that at the end - we only get in touch if you ask.

Every figure above - overheating scores, costs, grant rules and planning positions - follows our published methodology.

Related cooling guides

The grant and planning in Oldham

Learn more about cooling a UK home